image
Ship Engineers

May 14, 2021. Ship engineers Pedro Lebron and Christian Lebron disconnect the potable water line in port before departure. The ship can hold up to 4,800 gallons of water which can be used in port and at sea before the reverse osmosis system, which makes potable water from seawater, is turned on.

Learn more

Credit

Image courtesy of NOAA Ocean Exploration, 2021 Technology Demonstration.

Related Expedition
2021 Technology Demonstration